 |
| |
Windows 2003
Dedicated Server Solutions
Designed with out standing reliability, performance and highly
competitive pricing, our High Performance Windows 2003 Dedicated
Hosting Solutions are made for demanding applications. Dell PowerEdge
Web servers bring the highest level of performance and reliability
in the industry. Tango Hosting offers single and dual CPU configurations
and will custom configure servers to your exact specifications.
Performance Value Pre-Configured Solution
|
 |
 |
Brand Name  |
Dell PowerEdge 860 NEW Server! |
CPU  |
Intel® Pentium®D 915 processor, 2.8GHz |
Memory  |
1GB DDR2 |
System Controller:  |
SATA II |
Disk Drive 1:  |
250GB |
Disk Drive 2:  |
Optional |
IPs  |
1 |
OS  |
Window 2003 R2 Standard |
Services  |
Web, FTP, DNS, Mail and more |
Traffic  |
500 GB ( Burstable Quality Bandwidth ! ) |
Control Panel |
Helm Lite 5 Free |
| |
|
Pay Monthly |
$199.95 ( No Long Term Contract ! ) |
Pay Yearly  |
$166.95 ( Two Months Free ) |
Setup  |
$99.95 |
 |
Get a Quote |
Performance Enterprise Pre-Configured Solution
|
 |
 |
Brand  |
Dell PowerEdge 1950 NEW Server! |
CPU 1  |
Dual Core Intel® Xeon® 5148LV, 4MB Cache, 2.33GHz, 1333MHz FSB |
CPU 2  |
Optional |
Memory  |
2GB 667MHz (2x1GB), Dual Ranked DIMMs |
System Controller:  |
SAS 5/i Integrated, No RAID |
Disk Drive 1:  |
73GB |
Disk Drive 2:  |
Optional |
IPs  |
10 |
OS  |
Window 2003 R2 Standard |
Services  |
Web, FTP, DNS, Mail and more |
Traffic  |
500 GB ( Burstable Quality Bandwidth ! ) |
Control Panel |
Helm Lite 5 Free |
|
|
Pay Monthly |
$299.95 ( No Long Term Contract ! ) |
Pay Yearly  |
$274.95 ( One Month Free ) |
Setup  |
$99.95 |
 |
Get a Quote |
|
 |
|
 |
 |
 |
 |
Tango Hosting
World Class Data Center

Our data center is cooled by 16 computer-grade Liebert air conditioning
systems

Each server cabinet is pre-wired with Cat 5 cross-connects to
the main distribution frame (MDF) to allow instantaneous connection
to any other point within the facility.

All aspects of the datacenter operations, including the Very
Early Smoke Detection system are monitored 24 hours a day from
the operations control center.

Entry into the datacenter is restricted by multiple levels of
access control, including biometric palm scanners, and key card
readers within the facility limit movement to authorized areas.

Power to the datacenter is supplied by a redundant transformers
and power distribution centers.
The Automatic Transfer Switch (ATS) detects power failures and
immediately brings the generators online with the UPS systems
provide power, ensuring 100% uptime.
|
 |
|
 |